http://www.milonic.com/beginner.php
civmec logo
civmec engineering & construction
capabilities tick
We are committed to the safety and well being of all our employees



Our Capabilities

> Modular Assembly

Civmec’s Fabrication workshop is strategically located, directly facing the AMC 15,000 ton, 3000 ton heavy loadout wharves and the Gorgon roll on roll off wharf. Our large fabrication workshop is designed for heavy lift overhead cranes and has tall bays to cater for the unrestricted assembly of large modules for process plants, materials handling equipment and off-shore wharf structures. Large modular assemblies up to 29.5m wide x 20m high x 149m long can be fabricated and assembled into single units in our central bay 3 and loaded out using the onsite self propelled modular transporters directly to the heavy AMC load-out wharfs.



capabilities tick
© 2011 Civmec  |  Website by Impulse Multimedia  |  Optimised for 1280x1024 & Internet Explorer 6+