Delivering more than 3,000 cubic metres of concrete and approximately 1,000 tonnes of steel for the project, our scope included construction of 2 kilometres of internal plant roads complete with earthworks and road pavements; detailed and bulk earthworks; installation of drains and concrete piping; concrete raft, pad foundations, slabs and sumps; fabrication and erection of all CIL and leach tanks and ore bin; installation of ball mill; all site SMP works (circa 11,000 kilometres of piping laid); supply and installation of HDPE to process and raw water dams; and construction of concrete retaining walls, including backfill and compaction of soil.
Mungari Gold Project
Resources
- 06.2013 - 05.2014
- Sedgman (for La Mancha Resources)
- Kalgoorlie, WA