Civmec’s scope of works included earthworks; civils; concrete; structural, mechanical and piping (SMP); and commissioning. This included:
- 250,000 cubic metres of earthworks
- 8,000 square metres of formwork
- 2,000 tonnes of reinforcement
- 13,000 cubic metres of concrete
- ,2,000 tonnes of SMP structural steel
- 13,000 linear metres of piping
- 1,160 precast units
- 2,000 tonnes of structural steel fabrication
- 4,500 linear metres of pipe fabrication.