Key Information


June 2016
July 2018
Acciona Infrastructure
Sydney, NSW

The Sydney light Rail project is a vital part of Sydney’s public transport system, designed to reduce congestion in and around the CBD.

Civmec was contracted to carry out structural, concrete works and construction of the 500 metre Moore Park Tunnel.

Responsible for construction of the tunnel structure from the subgrade level and above, our scope of works included formwork reinforcement and placement of concrete for base slab and walls, track slab, erection and placement of precast planks and waterproofing.

These works followed on from the supply, delivery, post-tensioning and installation of all formwork, reinforcement, concrete and precast concrete elements required for the construction of RW14 and RW15 retaining walls for the Eastern Distributor Bridge.