Key Information


December 2016
Q4 2019
Alliance with Water Corporation and Black & Veatch
Woodman Point, WA

Civmec was awarded an EPC alliance contract with the Water Corporation and Black & Veatch for the design and construction of the expanded plant to increase the capacity to 180ML/day.

Civmec’s scope of works included earthworks, civils, concrete, structural, mechanical & piping, and commissioning, including:

  • earthworks – 250,000m3
  • formwork – 8,000m2
  • reinforcement – 2,000t
  • concrete – 13,000m3
  • SMP structural steel – 2,000t
  • piping – 13,000lm
  • precast – 1,160 units
  • structural steel fabrication – 2,000t
  • pipe fabrication – 4,500lm