Key Information


June 2016
February 2018
Seymour Whyte
Sydney, NSW

The largest uninterrupted single span pedestrian bridge in Australia, the Nepean River Bridge provided us with the opportunity to showcase our ingenuity and ability to deliver innovative solutions.

Our scope of work included the fabrication, offsite trial assembly, delivery and site assembly of the 200 metre long bridge. We undertook the assembly of the final bridge structure in a purpose-built 65 metre onsite workshop, complete with two 20 tonne gantry cranes.The complexity of the onsite assembly also required the fabrication and installation of engineered temporary collapsible access platforms.

The bridge provides a safe crossing for pedestrians and cyclists over the Nepean River and improves connections to existing and future shared paths, including the Great River Walk.

EMAIL ALERTS