Key Information


March 2011
October 2012
SKM (for Rio Tinto Iron Ore)
Henderson, WA

Civmec was awarded the supply, manufacture, surface protection, storage and transport to the loadout area for the wharf topside modules as part of the marine works for the Cape Lambert Project. 

Components which also formed part of the topside modules included secondary steelwork; in-situ and precast concrete; chutes; conveyor stringers; pulley frames; s/s sumps; pipe work; and drive bases. 

The wharf topside consisted of three modules:

Module A

L 24,000mm; W 32,220mm; H 21,772mm; Weight 990t

Module B

L 24,800mm; W 26,500mm; H 21,772mm; Weight 1104t

Module C

L 43,200mm; W 21,300mm; H 9,000mm; Weight 630t

 