Key Information


September 2011
June 2013
KBR (for Rio Tinto Iron Ore)
Pilbara, WA

Civmec delivered significant site construction civil works at the Hope Downs 4 (HD4) mine in the Pilbara, to support the sustainment of production tonnage.

Our scope included the concrete works package, totalling circa 20,000m3 of concrete for the construction of the new facilities and associated infrastructure.

The works package included earthworks and in-situ construction of access roads and foundations, sump slabs, sump walls and ground slabs.

 

EMAIL ALERTS