We manufactured and delivered bridge barriers and transfloor panels for the 20 kilometre section of works between Warrell Creek and Nambucca Heads.
The project required the establishment of a 30,000-square-metre precast facility in Macksville, NSW, which included a crane system capable of lifting 100 tonnes in a single lift.