The package comprised detailed earthworks and 53,000 cubic metres of structural concrete components for the dry plant, including two primary, two secondary and two tertiary crushing areas, two air classification and two primary grinding areas, course ore stockpile, dry magnetic separation building, dry rejects, conveyors and all related earthing.
This was followed with the award of a fabrication/modularisation package for the supply and modular assembly of 4,700 tonnes of conveyor, trusses, trestles and modules; and later, contracts for onsite structural, mechanical, module installation and hook-up of 30,000 tonnes of components, and approximately 630 kilometres of electrical and instrumentation works for the dry plant.